Sr. No. Clients Name of The Contractor Description of Work & Location
OFF SHORE SITES
1 ONGCL SWIBER Topside Modification Onshore Fabrication and Offshore Hook-up for B193 Subsea Pipeline Project
2 ONGCL ESSAR Modification Of D1 Platform, Hook-up, Pre-Commissioning & Asst. to Commissioning of 3 Nos.
(D1-B, D1-C & D1-D) Well Head Platform
3 ONGCL HAL OFFSHORE LTD. Replacement of produced water conditioning water system at BHS platforms
ON SHORE SITES
4 BSL BHARATI SHIPYARD LTD. Assembly & Erection of Legs of Rig Yard No. 351
5 ONGCL THERMAX LTD. Erection & Providing Assistance during Commissioning of 1 x 99 TPH, 12 Kg/cm2 at battery limit, 220 Deg. C at battery limit, FM Boiler at Larsen & Toubro Ltd. A/c ONGC-Uran
6 ONGCL LARSEN & TOUBRO LTD. Fabrication and Erection of AG Piping works (Offsite & Utilities) for Additional Processing Unit, ONGC-Uran Project
7 PIPAVAV PIPAVAV DEFENCE AND OFFSHORE ENGINEERING COMPANY LTD. (SEZ UNIT) Pipe Spool Fabrication works at Pipavav (BMS)